Sunday, 19 October 2014

Illness film | first draft

Here's a script I wrote to my camera operator/ editor, and the one I followed throughout the shoot.
Ultimately, the actual film turned out a little different but because we got rid of something that didn't fit the idea visually and added extra footage.


 I APPEARANCE

-seaside-

water view/ seaside/waves
she is coming out of waters
she is lying on the seashore
her feet close-up move towards the shore, coming from the water
her full length body/general view/she is standing looking into the camera

>>>editing from one location to another/smoothed by the feet moving by the seaside CLOSE-up engaging the whole shot>>and then the same feet making the following step onto the forest ground

-forest scene-

she looks like a naked muse or a forest fairy/needs a proper styling/hippie/mysterious vibe
she suddenly turns around worried/close-up
his face/portrait-shot /he is dressed normally
she comes up to him
general view/ from the profile/ the look at each other/ she puts her hand on his chest leaning her body towards him
close-up/she is worried
she tries to look what’s under his jacket
the viewer sees there’s (close-up shot of her fingers trying to reach his shirt underneath the jacket) blood
he looks annoyed and forces her hand to get away from there, and he zips up his jacket
she is confused
he takes her hand

they’re both suddenly dressed (frontal look towards the camera now)
he looks at her

-seaside location-
her face close-up opposite the sea

-forest-

 he smiles/close-up

-seaside-

she smiles/close-up



-on the beech-
her eyes /face
(she’s lying on the ground)
editing allows the foiled stars appear on her cheers, while she starts smiling wider 


-beach-
the couple is running into the scene
they dance
slow motion
(black figures dressed in Alex Groover hopefully)

-beach-
waves

-beach-
them standing still
-the V-shaped glass scene

-close-up of the glass and his hand pouring red wine 

his smile close up
her smile





II SYNTHESIS

forest
she is dancing to his guitar tunes,
dressed in black Alex Groover styled clothes

mixing elements
i.e.sand and metal pieces, etc

-random location-
building works
cement being mixed

-beach-
they stand in front of the camera and the items of clothes start disappearing and appearing once from her then from him/playful change

-beach-
dancing

-they plant a flower on the beach (stone-beach preferably but whatever)


-plant is growing-


-LIVERPOOL STR STATION-
fast-forwarded movement of the crowd traveling up the stairs and throughout the station
escalators
etc

-beach-
flower
them dancing

-
-beach-
they sit opposite each other and there’s this flower in-between them two

flower
it gradually starts getting covered with foil from the roots to its’ very petals 


-beach-
them dancing and then it starts going reverse

then it gets slow motion

then really slow motion


-beach-
she passes by a piece of foil
he unwraps it
there’s her heart
he looks at her with a serious face


=ALL THE SCENES OF THE EPISODE GO REVERSE REAL QUICK FROM THAT MOMENT=



III REACTION


-forest/or the same beach flower area?-
flower’s cut by scissors

-beach-

close-up of her lower belly area where she’s holding that full v-shaped(martini) glass of wine

close-up of her face

close-up of his face

-forest-
dancing in alex groover’s designs

-beach-
she has a sip
he has a sip

close-up of his shirt with the blood being removed (reverse editing of bleeding underneath the shirt)

general view:
she’s running towards him
he’s running towards her

<close-up of his white clean shirt>

general view:
they run towards each other
he stops (it’s all a bit slow motion, Maya Deren style)
he looks at his white shirt
she looks at him in hope and fear
he takes a step back
superslow motion/ her face in pure fear/ desolated eyes
<sound change >
<we may add the scene of something random falling down into the ocean, like a piano? like a telly, whatever works. should be taken from a tv programme so it looks a bit VHS’y >
her face in despair

general view/profile shot:
she’s stretching her arms trying to reach him again

her and him close-up

general shot:
they are force to walk backwards as in despite their desire, but it’s her wanting to get close to him, and him going with the air flow, taking steps back

-forest-
they move towards, and there’s foil coming from his mouth to hers


-beach-

She’s falling down after feeling chest pain
she’s crawling towards the sea

close-up of her exhausted face looking at the sea


-beach-
she starts caughing 
and then puking with a float of foil 
and then it gets longer and longer and goes round in spiral (gotta find a carcass/frame/construct, something bendable to wrap foild around it)


and then she’s all alone on the beach covered with foil

No comments:

Post a Comment